Resource logo with tagline

Tree Energy Solutions – TotalEnergies e-NG plant

USA
Announced

Overview

Status
-
Announced
Region
-
North America
Geography
-
USA
State
-
Texas
Equity Owner
-
TotalEnergies, TES
Proponent
-
TotalEnergies, TES
Output
-
e-natural gas
Type of electricty
-
Wind and solar
Capacity
-
100,000 to 200,000 metric tons of e-NG per year
Financing
-
Technology
-
electrolysis
Technical Advisors
-
Advisors
-
Project Contact
-
Lawyers
-
Stéphane Michel, president, Gas, Renewables & Power at TotalEnergies; Marco Alverà, chief executive officer of TES
Project Cost
-
Offtaker
-
Commercial Operations Date
-
Decommission Date
-
FID
-
August, 2024

Description

TotalEnergies has partnered with Tree Energy Solutions to study and develop a large-scale production unit in the United States for e-natural gas, a synthetic gas produced from renewable hydrogen and CO2.

The project, which is expected to produce 100,000 to 200,000 metric tons of e-NG per year, will be equally owned by the partners and operated by TotalEnergies.

The e-NG will be produced in two steps: To produce renewable hydrogen, a 1 GW electrolyzer will be powered by approximately 2 GW of wind and solar energy supplied by TotalEnergies through long-term PPAs; this renewable hydrogen will then be combined with biogenic CO2 to obtain the e-NG.

The resulting e-NG produced can be transported and/or liquefied, then sold like natural gas, using existing infrastructure, and end-customers will be able to use it without any adaptation to their facilities.

TotalEnergies and TES aim to reach a FID in 2024.



TotalEnergies and TES partner on US e-NG facility

TotalEnergies has partnered with Tree Energy Solutions (TES) to study and develop a large-scale production unit in the United States for e-natural gas (e-NG), a synthetic gas produced from renewable...

Read More

Welcome Back

Get Started

Sign up for a free 15-day trial and get the latest clean fuels news in your inbox.