Resource logo with tagline

Burrard-Hazer Hydrogen Project

Canada
Greenfield

Overview

Status
-
Greenfield
Region
-
North America
Geography
-
Canada
State
-
British Columbia
Equity Owner
-
Proponent
-
Hazer, Suncor, FortisBC
Output
-
Turquoise hydrogen
Type of electricty
-
Capacity
-
Blue hydrogen: 2,500 tpa
Financing
-
Technology
-
methane pyrolysis
Technical Advisors
-
Hatch; Wood (design)
Advisors
-
Project Contact
-
Geoff Ward Email: contact@hazergroup.com.auPhone: +61 8 9329 3358
Lawyers
-
Project Cost
-
Offtaker
-
Commercial Operations Date
-
2025
Decommission Date
-
FID
-
April, 2024

Description

The proposed Burrard Hazer Hydrogen Project is a collaboration between FortisBC Energy, Suncor Energy, and Hazer Group Limited. An MoU was signed in February 2022.

The project is a demonstration of the Hazer Process, a methane pyrolysis technology producing low-carbon hydrogen for clean energy, transport, or industrial uses, and a synthetic graphitic carbon byproduct for manufacturing or industrial use.

The project is located at Suncor Energy’s Burrard Terminal site in Port Moody, British Columbia.

When established, the project is expected to process natural gas feedstock to produce 2,500 tpa low-carbon hydrogen and approximately 9,000 tonnes of synthetic graphitic carbon by-product.

A FID is targeted in the first half of 2024, with operations targeted to commence in 2025 or early 2026.

The project has received up to CAD $8m of grant funding from the province of British Columbia. It is considered a near-commercial scale plant.


Welcome Back

Get Started

Sign up for a free 15-day trial and get the latest clean fuels news in your inbox.