Resource logo with tagline

Fortis BC | Tilbury Phase 1 LNG Expansion Project

Canada
Operational

Overview

Status
-
Operational
Region
-
North America
Geography
-
Canada
State
-
British Columbia
Equity Owner
-
FortisBC
Proponent
-
FortisBC
Output
-
LNG
Type of electricty
-
Renewable hydroelectricity: BC Hydro
Capacity
-
LNG: 0.25 mtpa
Financing
-
Technology
-
Export facility
Technical Advisors
-
Bechtel
Advisors
-
Project Contact
-
Lawyers
-
Project Cost
-
$ 400m
Offtaker
-
Commercial Operations Date
-
2019
Decommission Date
-
FID
-
October, 2014

Description

The Tilbury LNG facility is powered by renewable hydroelectricity, creating safe, lower-carbon LNG since 1971. Originally, the facility’s purpose was to store LNG. It was then developed to produce LNG for transportation and export to China.

Phase 1 expansion, which included a 46,000 cubic meter storage tank and a liquefaction capacity of 0.25 mtpa, was commissioned in 2018.

 

 

 


Welcome Back

Get Started

Sign up for a free 15-day trial and get the latest clean fuels news in your inbox.