Nauticol Energy Net-Zero Blue Methanol Project
Canada
Canceled
Overview
Status
-
Canceled
Region
-
North America
Geography
-
Canada
State
-
Alberta
Equity Owner
-
Nauticol Energy Ltd
Proponent
-
Nauticol Energy Ltd
Output
-
Methanol
Type of electricty
-
Capacity
-
3.4 million metric tonnes/year
Financing
-
Technology
-
blue methanol
Technical Advisors
-
Advisors
-
Project Contact
-
Nauticol president and CEO Mark Tonner
Lawyers
-
Project Cost
-
CAD $4bn
Offtaker
-
Commercial Operations Date
-
Decommission Date
-
FID
-
Description
The Grande Prairie Nauticol Energy Blue Methanol project was to produce 3.4 million metric tonnes of blue methanol annually.
The project, which was announced in 2018 and would have been operational in 2025, was canceled on February 7, 2023. A smaller facility could be planned on the site in the future.