Resource logo with tagline

Advanced Ionics | Water-Vapor Electrolyzer Pilot Project

Advanced Ionics has a pilot project to test its new water-vapor electrolyzer technology to produce low-cost green hydrogen. Advanced Ionics is a developer of green hydrogen electrolyzers. The pilot project is sponsored by Shell International Exploration and Production Inc., through its Shell GameChanger program. The project supports the scaling of Advanced Ionics’ second-generation, 800 cm2 stack.… Continue reading Advanced Ionics | Water-Vapor Electrolyzer Pilot Project

RAI Energy | Green Fuels Co-Location Project

RAI Energy was exploring electrolyzer co-location opportunities to produce green hydrogen and ammonia at some of its sites. In September 2024, it shelved the potential co-location project.

Ten08 | Hybrid Blue-Green Ammonia Production Export Facility

Ten08 is developing an industrial-scale hybrid blue and green ammonia production export facility on the Gulf Coast of Texas with the goal of producing the most competitively priced ammonia molecule. The first phase, comprising 1.4 million metric tonnes per year of ultra-low carbon ammonia production, is expected to commence operations in late 2029 / early… Continue reading Ten08 | Hybrid Blue-Green Ammonia Production Export Facility

GoSolar | Missouri Green Ammonia Project

GoSolar’s project in Marion County, Missouri, has a planned 3,700 MW+ DC solar plant, off-grid, with BESS storage and 750 MW of electrolysis, with production of 675,000 tons per year of green ammonia. In addition, a grid-connected portion of the Missouri project would have 500 MW+ DC PV solar, 500 MW+ BESS, and 100 MW… Continue reading GoSolar | Missouri Green Ammonia Project

GoSolar | Iowa Green Ammonia Project

GoSolar’s Iowa project in Lee County consists of a planned off-grid 1,850 MW DC PV solar plant to DC buffer storage and 370 MW DC hydrogen electrolyzer capacity, producing 340,500 metric tons of green ammonia per year. The project also has a separate grid-connected section with 207 MW DC PV solar and 207 MW BESS… Continue reading GoSolar | Iowa Green Ammonia Project

NextEra | Spiritwood Green Ammonia Project

Construction of a production facility near Jamestown, North Dakota, capable of 100,000 tons/year of green ammonia. Construction of the Project is estimated to take five years to complete in a phased approach, including potential capacity expansions. The operating life thereafter is designed for a minimum of 20 years.

Air Liquide | Chevron | LyondellBasell | Uniper | US Gulf Coast Hydrogen & Ammonia

In October 2022, Air Liquide, Chevron, LyondellBasell, and Uniper SE announced their intent to collaborate on a joint study to evaluate and potentially advance the development of a hydrogen and ammonia production facility along the U.S. Gulf Coast. Specifically, the consortium would assess the potential for producing hydrogen using natural gas with CCS and renewable… Continue reading Air Liquide | Chevron | LyondellBasell | Uniper | US Gulf Coast Hydrogen & Ammonia

CALAMCO | Clean Ammonia Bunkering Demo

American Bureau of Shipping, CALAMCO, Fleet Management Limited, Sumitomo Corporation and TOTE Services, LLC have executed an April 2024 Memorandum of Understanding to jointly conduct a feasibility study to establish a supply chain for the provision of clean ammonia ship-to-ship bunkering in the US West Coast. The study will be conducted at the Port of… Continue reading CALAMCO | Clean Ammonia Bunkering Demo

StormFisher | Thorold Clean Fuels Facility

StormFisher Hydrogen is developing a clean fuels facility project in Thorold, Ontario. The project is expected to cost CAD 200M and serve as an anchor project for a hydrogen hub in Thorold. Once completed, the facility is expected to produce 1,250,000 gigajoules of renewable natural gas using clean hydrogen. Using electrolysis, the facility will be… Continue reading StormFisher | Thorold Clean Fuels Facility

Pattern Energy | Corpus Christi Green Ammonia Project

A 1-million-ton-per-year green ammonia project in Corpus Christi, Texas, at an expected cost of $9bn. The facility is projected to come online in 2028. It consists of a new renewables project, electrolyzers, storage, and a pipeline, because the electrolyzer site is away from the seaport. It also includes a marine fuels terminal and an ammonia… Continue reading Pattern Energy | Corpus Christi Green Ammonia Project

Welcome Back

Get Started

Sign up for a free 15-day trial and get the latest clean fuels news in your inbox.