The project involves the installation of Bloom Energy solid oxide electrolyzers at Xcel Energy’s Prairie Island nuclear facility in Welch, Minnesota. Engineering for the 240 kW demonstration is currently underway, with construction expected to begin in late 2023 and power-on expected in early 2024. The pilot project is a recipient of a $12m DOE grant.
![Resource logo](https://resource.news/wp-content/uploads/2023/05/Resource-logo.png)
![Vehicle logo](https://resource.news/wp-content/uploads/2023/05/Vehicle-logo.png)