Mustang Station Carbon Capture Project

A carbon capture project at the natural gas-fueled 464-MW Mustang Station of Golden Spread Electric Cooperative in Denver City, Texas. The University of Texas at Austin is conducting a FEED study for carbon capture at the station.

Blue Flint Ethanol CCS

A CO2 storage project at Blue Flint Ethanol plant near Underwood, in McLean County, North Dakota. The CO2 is stored in the Broom Creek Formation. The North Dakota Industrial Commission approved the project in May 2023. The CCS plant started injections in October 2023. The project was started by Midwest AgEnergy Group, which was sold… Continue reading Blue Flint Ethanol CCS

Project Interseqt

The project is expected to capture CO2 emissions from two of White Energy’s West Texas ethanol plants. The captured CO2 would be transported to Oxy’s West Seminole EOR field for injection and storage. The removal of 700,000 metric tons of CO2 annually from White Energy’s operations would lower the ethanol’s carbon intensity while taking advantage… Continue reading Project Interseqt

Clean Energy Systems Carbon Negative Energy Plant – Central Valley

A potential negative carbon project located in Central Valley, California, seeks to capture CO2 from an ethanol fuel source and store it at a rate of 0.32 Mtpa in a to-be-determined location and a potential 2025 start. A previous feasibility study conducted in 2016 by CES successfully utilized biofuel to power turbines and capture more… Continue reading Clean Energy Systems Carbon Negative Energy Plant – Central Valley

Dry Fork Integrated Commercial CCS (Wyoming CarbonSAFE Project)

Commercial-scale CCS for the Dry Fork Station power plant, in the Powder River Basin, in Wyoming, with saline storage sites capable of storing 50 million tonnes of CO2. Basin Electric’s Dry Fork Station has been the site of Wyoming Integrated Test Center since 2018. In 2023, Membrane Technology and Research, Kawasaki Heavy Industries, and Japan… Continue reading Dry Fork Integrated Commercial CCS (Wyoming CarbonSAFE Project)

Nauticol Energy Net-Zero Blue Methanol Project

The Grande Prairie Nauticol Energy Blue Methanol project was to produce 3.4 million metric tonnes of blue methanol annually. The project, which was announced in 2018 and would have been operational in 2025, was canceled on February 7, 2023. A smaller facility could be planned on the site in the future.

Mendota Biomass Carbon Removal and Storage Project

The Mendota Biomass Carbon Removal and Storage Project would deliver produced electricity to the California grid while capturing CO2 before it is released into the atmosphere. The revitalized biomass plant gasifies waste biomass fuels to produce a synthesis gas. This “syngas” is used by Clean Energy Systems’ (CES’) proprietary oxy-combustion technology to produce electricity while… Continue reading Mendota Biomass Carbon Removal and Storage Project

Diamond Vault Carbon Capture Facility

Carbon capture and storage facility at Cleco’s Brame Energy Center’s Madison 3 power plant.

Dave Johnston Plant CCUS Retrofit

A potential retrofit of some of the coal-burning units at PacifiCorp’s Dave Johnston coal-fired power plant near Glenrock, which is planned to be decommissioned by 2028. Jupiter Oxygen, Glenrock Petroleum, and others have expressed interest in purchasing the plant and in equipping some of its units with CCUS technology. In November 2022, PacifiCorp issued two… Continue reading Dave Johnston Plant CCUS Retrofit

Estevan NET Power Plant

A commercial-scale NET Power plant by 8 Rivers Capital in the City of Estevan NET Power’s Allam-Fetvedt cycle technology combusts natural gas with oxygen, as opposed to air, and uses supercritical carbon dioxide as a working fluid to drive the turbine and produce zero emissions electricity. This cycle can hit the same efficiency of a traditional… Continue reading Estevan NET Power Plant