CapturePoint | Energy Transfer | CENLA Hub

The Central Louisiana Regional Carbon Storage Hub — CENLA Hub — involves the capture of CO2 emissions from natural gas processing facilities owned by affiliates of Energy Transfer in north and central Louisiana, as well as from other industrial sources in the area, for transport by pipeline to deep underground sequestration in the CENLA Hub.… Continue reading CapturePoint | Energy Transfer | CENLA Hub

Avina Gulf Coast | E-Methanol

Avina’s e-methanol production facility leverages advanced processes from reputable technology providers to synthesize methanol from captured carbon dioxide (CO2) and green hydrogen (H2) produced from renewable energy sources. This large-scale production facility will supply e-methanol to a constantly growing fleet of methanol-powered vessels. Annual e-methanol production: more than 300,000 tons Annual green hydrogen production: 70,000… Continue reading Avina Gulf Coast | E-Methanol

Avina Northern Illinois | Liquified Green Hydrogen for Industry

Avina is developing an electrolytic liquefaction facility on-site with a greenfield hybrid renewable energy solution. Avina is developing the project with Messer America. The facility will produce liquid hydrogen from renewables-driven electrolysis. In its initial phase, it will have a production capacity of 15 metric tons per day. The plant could ultimately be scaled up… Continue reading Avina Northern Illinois | Liquified Green Hydrogen for Industry

Avina Midwest | SAF (Ethanol to Jet)

Avina’s Ethanol to Jet Sustainable Aviation Fuel Facility will convert low-carbon ethanol into a jet fuel. The facility, engineered to produce 120 million gallons of SAF annually, will utilize alcohol-to-jet production technology pathway. The end product will be certified to meet ASTM D7566 standards. FEED is expected to kick off in Q2 2024, and as… Continue reading Avina Midwest | SAF (Ethanol to Jet)

Entropy | Glacier CCS Project Phase 2

Phase 2 of Entropy’s post-combustion CCS project in Alberta, Canada. Glacier Phase 2 is planned to capture 137,000 tpa. As of June 2023, it is shovel-ready but awaiting additional clarity on carbon policy in Canada including specifics on the federal investment tax credit and carbon contract-for-differences. Once Phase 2 reaches FID it is expected to… Continue reading Entropy | Glacier CCS Project Phase 2

Entropy | Glacier CCS Project Phase 1b

A post-combustion carbon capture and storage project at the Glacier Gas Plant in Alberta, Canada. The Glacier project captures CO2 from the exhaust of a natural gas-fired reciprocating engine, with a CO2 concentration of 5.5%. The project’s first carbon injection into permanent geological storage occurred in August 2022, signaling the completion of Phase 1a. Phase… Continue reading Entropy | Glacier CCS Project Phase 1b

Monarch Energy | Geismar Louisiana Green Hydrogen

Monarch is exploring building a $426m facility in Ascension Parish Louisiana. The company estimates the proposed facility would employ a carbon-free process to manufacture 120,000 kilograms of hydrogen per day to be sold as a “green” feedstock for a wide range of industrial and chemical processes. Entergy Louisiana will work with Monarch Energy to leverage… Continue reading Monarch Energy | Geismar Louisiana Green Hydrogen

Santa Maria Renewable Resources | East Texas Bioefuels Project

Santa Maria Renewable Resources’s developemtn of a biofuels and sustainable agriculture project in East Texas. A daily output of up to 3,000 barrels per stream per day is expected, encompassing both renewable diesel and sustainable aviation fuel.

Infinium | Project Roadrunner CO2 to SAF

Project Roadrunner will convert waste CO2 and renewable power primarily into Infinium eSAF. It will also produce Infinium eNaphtha and Infinium eDiesel. The Power-to-Liquids eFuels facility is expected to be the largest PtL eFuels project in North America once operational. It is located in West Texas. The project will convert an existing brownfield gas-to-liquids project… Continue reading Infinium | Project Roadrunner CO2 to SAF

OnStream CO2 | Cameron Parish CO2 Hub

In November 2023, Commonwealth LNG entered into a MoU with OnStream CO2 LLC (Carbonvert/Castex Carbon Solutions JV) for a CCS solution at Commonwealth’s 9.3m tpa LNG facility under development in Cameron, Louisiana. Under the agreement, OnStream CO2 will design, construct, own, and operate CO2 capture equipment near the Commonwealth LNG site. The captured CO2 will… Continue reading OnStream CO2 | Cameron Parish CO2 Hub